Load and duty
Define connected loads, starting currents, load steps and the required PRP or ESP duty.
Gas project guidance
Enter power, configuration and operating mode. These details enable targeted preselection of suitable PSI natural gas models.
Model comparison

Open the technical specifications and data sheet for the selected model.
0 of 0 models
Project-oriented selection
Both PSI 33 natural gas configurations are rated at 30 kVA PRP and 33 kVA ESP. Use the same load and duty assumptions for the two configurations. Check enclosure, ventilation and noise requirements at the installation site, and confirm the natural gas quality and supply pressure for the selected set.
Compare the datasheets and installation details for the open PSI 33 O and the soundproofed PSI 33 S. For the fuel decision, see the diesel or gas generator guide.
Define connected loads, starting currents, load steps and the required PRP or ESP duty.
Check gas quality, available pressure and the required gas train against the engine and project specification.
Coordinate ventilation, exhaust routing, sound requirements, electrical integration and control interfaces.